************** No. ____________/dt.
Case No.9/2003 From M.C.Rath, To The Chief Executive
Officer,
Sub:
Publication of notice in the matter of Revenue Requirement and Retail Supply
Tariff for the year 2003-04.
Sir,
With reference to your tariff filing dated 27.01.2003 before this Commission
in respect of Revenue Requirement and Retail Supply Tariff for the year 2003-04,
I am directed to say that in order to dispose the matter through a Public
hearing, the same has been registered as Case No.9/2003 and admitted by the
Commission. 2. You are required
to publish the notice attached to this letter in each of the two consecutive
issues of one English and two Oriya daily Newspaper having wide circulation
in your area of supply. The publication shall be published by 05.02.2003 and
06.02.2003. You are also required to put a copy of the said notice alongwith
the proposed tariff rates & proposed additional charges leviable in the
notice board of your office as well as in offices of all Engineers in charge
of Distribution Divisions of your company. 3.
As
indicated in the notice, arrangements shall be made for facilitating inspection/perusal
and prompt supply of copies of Revenue Requirement and Retail Supply Tariff
proposals and/or salient features thereof (subject to payment of cost etc.)
on the same day or day following. 4. It
may kindly be noted that you may file a consolidated rejoinder to the Commission
on or before 11.03.2003 with regard to all the objections received by you
from interested parties/objectors and which are admitted by the Commission
within the meaning of the provisions of Reg. 44 and 45 of the O.E.R.C. (Conduct
of Business) Regulation, 1996. 5.
Public
Notice advertised in English and Oriya dailies shall be furnished to the Commission
as proof of compliance as early as possible. Yours
faithfully, S
E C R E T A R Y I/C ORISSA ELECTRICITY REGULATORY
COMMISSION PUBLIC NOTICE (CASE
No.9/2003) REVENUE REQUIREMENT AND RETAIL
SUPPLY TARIFF APPLICATION FOR THE YEAR 2003-04 BY CESCO 1. Central Electricity
Supply Company of Orissa Ltd., Bhubaneswar holding licence for Distribution
and Retail Supply (Licence No. 1/99) has applied to Orissa Electricity Regulatory
Commission for Revenure Requirement and Retail Supply Tariff for the year
2003-04. Copy of this application together with supporting materials are
available with Chief Executive Officer, CESCO, Bhubaneswar and all Executive
Engineers in charge of Distribution Divisions such as B.C.D.D.-I & II,
Bhubaneswar, Bhubaneswar Electrical Divn., Bhubaneswar, C.D.D- I & II,
Cuttack, Cuttack Electrical Divn., Cuttack, Puri Electrical Divn., Puri, Khurda
Electrical Divn., Khurda, Balugaon Electrical Division, Balugaon, Nayagarh
Electrical Divn., Nayagarh, Nimapara Electrical Divn, Nimapara, Kendrapara
Electrical Divn. No.I, Kendrapara, Kendrapara Electrical Divn. No.II, Marsaghai,
Jagatsinghpur Electrical Divn., Jagatsinghpur, Athagarh Electrical Divn.,
Athagarh, Salipur Electrical Divn., Salipur, Talcher Electrical Divn., Chainpal,
Dhenkanal Electrical Divn., Dhenkanal and Angul Electrical Divn., Angul. 2. Notice is hereby given that interested persons
may inspect/peruse the tariff proposal and take notes thereof at the offices
mentioned at para-1 above during office hours within 15 days of publication
of this notice by making a plain paper application to any one of the aforesaid
authorities. Salient features of the
revenue requirement shall be available for supply to the interested parties
from the offices mentioned at para-1 above on payment of Rs.30/- towards the
photocopying charges. This includes (a) write up on the application as submitted
by the licensee, (b) tariff revision proposal including the calculation of
expected revenue, (c) proposed tariff rates, (d) information on subsidy, (e)
calculation of capital base and reasonable return, (f) calculation of revenue
requirement, (g) calculation of clear profit, (h) additional charges leviable
over the prescribed tariff along with the clarifications sought for by OERC
and compliance on the same by CESCO. 2.1 A full set of Revenue Requirement and Retail Supply
Tariff Proposal documents together with supporting materials, copies of the
application, clarification can also be obtained from the offices mentioned
at para-1 above on payment of Rs.100/- towards photocopying charges. 3.
The Revenue Requirement and Retail Supply Tariff
Application for the Financial Year 2003-04 contains (a) details regarding
energy charge, monthly demand charge, monthly minimum fixed charges, customer
service charge and rebate, (b) monthly meter rent for various types of meters
and metering units and re-connection charges for various classes of consumers
and (c) revenue requirement and expected revenue from charges. 4.
One Power Intensive Ferro Alloys Industries located
in CESCO’s area has prayed the Commission for fixation of special tariff for
it. The Commission has decided to consider the same during the tariff hearing.
5.
Objections, if any, together with supporting materials
may be filed before the SECRETARY, ORISSA ELECTRICITY REGULATORY COMMISSION,
BIDYUT NIYAMAK BHAVAN, UNIT-VIII, BHUBANESWAR-751 012 in person or through
Registered Post only so as to reach him on
or before 28th February, 2003 without fail along with
service proof of the same on Chief Executive Officer, CESCO. The objection
should be filed in six copies and should carry full name and postal address
of the person sending the objection and shall be supported by an affidavit.
It should also be indicated if the objection is being filed on behalf of any
organisation or any category of consumers. It should also be specifically
mentioned if the objector wants to be heard in person by the Commission. Objections
received after the date specified above or those which will be deficient on
any or more of the above points may not be taken into consideration by the
Commission. It may also be noted that only those documents will be admitted
at the hearing which have been relied upon in the objection and true copies
of which have been filed along with objection. 6.
Dates of hearing shall be duly communicated to
parties whose objections are admitted. By order of the Commission Dt.01.02.2003 Sd/- S
E C R E T A R Y ( I /C)
CESCO’S TARIFF REVISION PROPOSAL FOR FY-2003-04
Sl No
Category of Consumer
Voltage Supply
Demand Charge (Rs / Kva)
Energy Charge (P/Kwh)
Energy Charge (Between 50%
LF) (P/Kwh)
Customer Service (Rs/Cust-omer)
Minimum Fixed Charge for
First Kw per Month (Rs)
Monthly Minimum Fixed Charge
for any additional Kw or part (Rs)
Rabate (P/Kwh)
DPS
LT CATEGORY
1 DOMESTIC 230V/ 400V
Kutirjyoti<=30KWH Fixed
monthly charge Rs 35/-
NA
NA
NA
NA
NA
Others
0<=100KWH
NA 200
NA
NA Rs20/- Rs10/- 10 NA
>100<=200
NA 320
NA
NA
More than 200 KWH (SLAB)
NA 450
NA
NA
BULK SUPPLY
230V/400V Total----> 2
COMMERCIAL
230V/400V
All Units if cons. within
0-100 KWH
NA 450
NA
NA Rs30/-
Rs20/-
10 NA
>100<=300
NA 580
NA
NA
More than 300 KWH(SLAB)
NA 600
NA
NA Total----> 3
IRRIGATION
230V/400V
NA 160
NA
NA Rs20/-
Rs10/-
10
NA 4
Street Lighting
230V/400V
NA 450
NA
NA Rs20/-
Rs10/-
1%
of Monthly Bill 2%
per Month 5
Small Industry
230V/400V
NA 450
NA
NA Rs40/-
Rs30/-
10 NA 6
Medium Industry
230V/400V
NA 450
NA
NA Rs80/-
Rs50/-
1%
of Monthly Bill 2%
per Month 7
Public Institution
230V/400V
NA 450
NA
NA Rs80/-
Rs50/-
1%
of Monthly Bill 2%
per Month 8
Public Water Works <100 KW
230V/400V
NA 450
NA
NA Rs80/-
Rs50/-
1%
of Monthly Bill 2%
per Month 9
Public Water Works
230V/400V 450 10
General Purpose
230V/400V Rs200/-
per Kva 450 Rs
30/-Pm 1%
of Monthly Bill 2%
per Month 11
Large Industry
230V/400V 450 HT Category 12
Bulk Supply - Domestic
11 / 33 kV As
per Existing Tariff 320 As
per Existing Tariff As
per Existing Tariff As
per Existing Tariff As
per Existing Tariff As
per Existing Tariff 13
Irrigation
11 / 33 kV Rs
30/- per KW 150 Rs250/-
Pm NA NA 10 NA 14
Public Institution
11 / 33 kV Rs
50/- per KW 420 Rs250/-
Pm NA NA 1%
of Monthly Bill 2%
per Month 15
Commercial
11 / 33 kV Rs
50/- per KW 420 Rs250/-
Pm NA NA 10 NA 16
Medium Industry
11 / 33 kV Rs
50/- per KW 420 Rs250/-
Pm NA NA 1%
of Monthly Bill 2%
per Month 17
General Purpose
11 / 33 kV Rs200/-
per Kva 420 Rs250/-
Pm NA NA 1%
of Monthly Bill 2%
per Month 18
Public Water Works
11 / 33 kV Rs200/-
per Kva 420 Rs250/-
Pm NA NA 1%
of Monthly Bill 2%
per Month 19
Large Industry
11 / 33 kV Rs200/-
per Kva 420 Rs250/-
Pm NA NA 1%
of Monthly Bill 2%
per Month 20
Power Intensive Industry
11 / 33 kV Rs200/-
per Kva 300 Rs250/-
Pm NA NA 1%
of Monthly Bill 2%
per Month 21
Mini Steel Plant
11 / 33 kV Rs200/-
per Kva 300 Rs250/-
Pm NA NA 1%
of Monthly Bill 2%
per Month 22
Railway Traction
11 / 33 kV Rs200/-
per Kva 300 Rs250/-
Pm NA NA 1%
of Monthly Bill 2%
per Month 23
Colony Consumption
11 / 33 kV 320 EHT Category 24
General Purpose
132 kV Rs200/-
per Kva 300 Rs700/-
Pm NA NA 1%
of Monthly Bill 2%
per Month 25
Large Industry
132 kV Rs200/-
per Kva 295 Rs700/-
Pm NA NA 1%
of Monthly Bill 2%
per Month 26
Railway Traction
132 kV
Rs200/-
per Kva
290
Rs700/-
Pm
NA
NA
1%
of Monthly Bill
2%
per Month
27
Heavy Industry
132 kV
Rs200/-
per Kva
295
Rs700/-
Pm
NA
NA
1%
of Monthly Bill
2%
per Month
28
Power Intensive Industry
132 kV
Rs200/-
per Kva
290
Rs700/-
Pm
NA
NA
1%
of Monthly Bill
2%
per Month
29
Mini Steel Plant
132 kV
Rs200/-
per Kva
290
Rs700/-
Pm
NA
NA
1%
of Monthly Bill
2%
per Month
30
Emerg. Supply to CPP
132 kV
380
Rs700/-
Pm
NA
NA
1%
of Monthly Bill
2%
per Month
31
Colony Consumption
132 kV
260
32
D.C. Services
220 Volts
i)
Domestic
ii)
Commercial
iii)
Small Industry
* Consumption in excess of 50% &
upto 60% by EHT and HT Consumer shall be payable @ 220 paise / Kwh &
240 paise/ Kwh respectively and Consumption above 60% by EHT & HT
consumer shall be payable @ 190 paise /Kwh & 210 paise /Kwh respectively
Licencee ..........................................
OERC Form No. F.16 Proposed Charges, other than and in
addition to the charges of tariff leviable for the
purpose (a) MONTHLY METER RENT Existing in Rs Proposed in Rs 1
Single phase electro-magnetic KWH meter
15
15 2
3 Phase electro-magnetic KWH meter
30
30 3
3 Phase electro-magnetic Trivector Meter
800
800 4
Trivector Meter for Railway Traction
800
800 5
Single phase Static KWH meter
35
35 6
3 Phase Static KWH meter
100
100 7
3 Phase Static Trivector Meter
800
800 8
3 Phase Static bivector meter
800
800 9
A set of LT current transformers 10
11 KV Metering Unit without meter 11
33 KV Metering Unit without meter 12
EHT metering arrangement without meter
(B) RECONNECTION CHARGES 1
Single phase Domestic consumer
30
60 2
Single phase other consumer
50
100 3
Three phase L.T. consumer
100
200 4
HT and EHT consumer
500
1000
(C)
BASIS OF CALCULATION OF MONTHLY METER RENT RATE MAKING
(D)
BASIS OF FIXATION OF LOAD FACTOR FOR VARIOUS
CATEGORIES OF CONSUMERS WITH DEFECTIVE METERS Existing Additional Kv Rs. Proposed
(E)
BASIS OF FIXATION OF MINIMUM CHARGE
Kutir Jyothi
Domestic
20
10
As per existing
Commercial
30
20
-do-
Irrigation
20
10
-do-
Street Lighting
20
10
-do-
Small Industry
40
30
-do-
Medium Industry
80
50
-do-
Public Institution
80
50
-do-
Public Water Works
80
50
-do-
(F)
BASIS OF FIXATION OF MAXIMUM DEMAND CHARGE
(G)
POWER FACTOR INCENTIVE & POWER FACTOR
PENALTY
(H)
REBATE & PROMPT PAYMENT INCENTIVE
(I)
DELAYED PAYMENT SURCHARGE |
Our Address: Revised on February 10, 2003 Site Designed and Maintained by |