CASE NO. 17 of 1998
Present:
Shri S. C. Mahalik, Chairman
Shri A. R. Mohanty, Member
Shri D. K. Roy, Member
M/s. Nava Bharat Ferro
Alloys Ltd., Khadgaprasad, Dhenkanal -Petitioner |
Vrs.
|
M/s. Grid Corporation of Orissa Ltd.,
Janpath, Bhubaneswar -Affected Party
|
For Petitioner:
Mr. J. Ramesh, Vice President along with Mr. D. Ashok, Executive Director.
For Affected Party:
Mr. B.K. Mohanty, Chief Engineer (Comm.),
Mr. M.K. Sircar, Executive Engineer (Elect.),
GRIDCO, Bhubaneswar.
Date of argument: 11.01.99
Date of Order : 29.01.99
ORDER
The petitioner M/s Nava Bharat Ferro Alloys Ltd. (M/s
NBFA Ltd.) in its application dt.26th October'98 has applied for permission under Section
21(3) of Orissa Electricity Reform Act, 1995 read with Section 44 of the Electricity
(Supply) Act, 1948, for setting up of a 30 MW CPP at Khadgaprasad in Dhenkanal district,
Orissa.
2. The petitioner has averred that M/s NBFA Ltd. has set up a ferro
alloys plant to produce 50,000 tonnes of ferro chrome per year and has commenced operation
since June, 1997.
3. Further, according to the petitioner, the manufacturing process used
for producing ferro alloys is power intensive and, therefore, its financial viability is
highly dependent upon cost of power.
4. According to the petitioner, due to high cost of power available
from Gridco @ Rs.3.08 KWh, it could only utilise its capacity to the extent of 19.8%
during the year 1997-98. As a result of that, the cost of their product in international
competitive market has become unviable. Moreover, during the said period, only one furnace
was switched on while the production in the second one could not commence though it was
ready in all respects.
5. It is also averred that assured power supply at reasonable cost is
highly necessary for the industry to survive in competitive international market.
Therefore, it is essential for them to have a 30 MW Coal based Thermal Power Plant. Side
by side, it is also contended that the cost per Kwh at the generator bus is estimated at
Rs.1.88 which will decrease further with repayment of loan. With captive power available
at such low cost as against Rs.3.08 charged by Gridco, the ferro alloys plant of NBFA Ltd.
in Orissa can achieve a high utilisation capacity and earn valuable foreign exchange.
6. The petitioner has also averred that adequate land, water and coal
deposit at Talcher which is close to their site, is available for setting up of the
CPP.
7. The affected Party (Gridco), in its counter dt.10th December'98,
while, inter alia, relying upon its letter No.120 dt.25.7.98 addressed to the Director
(Engg.) has stated that it has no constraint in meeting the power requirement of the
petitioner. It has further gone on record to assert that if the industry consumes more
energy, the unit cost of power would be reduced to that of the cost of generation from the
proposed CPP as estimated by the petitioner which has, in fact, been considerably cheaper
from 01.12.98 with implementation of new tariff.
8. The affected party, in its letter No.120 dt.25.7.98, amongst other
things, has raised the following points:-
To begin with M/s NBFA Ltd. had a contract demand of 34 MVA which has
been reduced to 15 MVA from 22.3.98. Even though, the contract demand of the petitioner is
now only 15 MVA, the justification for installation of a 30 MW CPP be taken into
consideration.
The petitioner being an export oriented unit has been receiving power
supply for 16 hours a day from NTPC (wheeled by Gridco) while the balance power
requirement is met by Gridco at normal tariff rate applicable to power intensive industry.
The normal tariff for energy for power intensive industries was Rs.2.50 per unit.
The cost of generation should have been calculated taking the
depreciation at 7.84% instead of 5.06%. Further, if Return on Equity (ROE) @ 16% is
included, the cost of generation per unit will be in the region of Rs. 2.41 per unit.
9. In the rejoinder filed on 23rd December'98, the petitioner has
averred that the tariff effective from 1.12.98 for power intensive industries is Rs. 2.74
per unit and hence, it is no way cheaper compared to the unit cost of generation from the
CPP.
10. In a pre-hearing conference on 28.8.98 attended by the petitioner
& Director (Tariff) and Director (Engg.), it has been clarified that the Contract
Demand with Gridco has been reduced to 15 MVA from that of 34 MVA because of the high cost
of power and as a result of that only one of the furnace is operated with effect from
22.3.98 partly utilising NTPC power available at Rs.2.35/unit (including wheeling
charges).
It is also clarified that the proposed 1X30 MW Steam Turbine Generator,
though a self-sufficient unit and independent of power supply from Gridco, will, however,
run parallel with Gridco's system having suitable protective devices. The petitioner
further clarified that in addition to running parallel with Gridco's system, it will enter
into a back up power supply agreement with Gridco for a Contract Demand of 5 MVA to meet
the emergency load on account of failure of its proposed Captive Power Plant.
10.1 The petitioner, in its clarificatory letter dt.29.8.98 maintained
that even if additional cost on account of Return on Equity (ROE) and cost of back-up
power (5 MVA) from Gridco at Gridco's tariff rate is included to arrive at the unit cost
for their total plant consumption, it will be less than the Gridco's tariff. The
petitioner further maintained that the overall cost of power from the CPP will decrease
from the second year onwards when loan is repaid year to year and consequently the
interest burden is also reduced.
11. From the pleadings of the parties on record, it appears that there
is no dispute or controversy on the following points:-
that the petitioner company is an export oriented unit and that it is
a power intensive industry; and
that assured power supply is needed at reasonable cost to survive in
the highly competitive international market.
12. It appears from the pleadings of the petitioner that the unit cost
of generation of power from the proposed CPP of the petitioner company will be 222.79
paise taking return on equity into account and hence it is comparatively cheaper than the
tariff realisable by Gridco from such type of industries. This is evident from para 5 of
the letter from petitioner dated 29.08.98.
13. In course of the hearing, Mr. J. Ramesh, Vice-President of the
petitioner company submitted that setting up of a C.P.P. will be economical and
technically fool-proof for assured power supply and will also be eco-friendly and
therefore, they be granted permission as applied for.
14. On the other hand, Mr. B.K. Mohanty, Chief Engineer (Commerce) of
the Gridco. contended that if an industry like Nava Bharat Ferro Alloys Ltd. is taken out
of the net work of the Gridco. it is bound to upset its revenue.
15. Mr. B.K. Sahoo, Director (Engg.), with the permission of the
Commission, sought for a technical clarification from Mr. D. Ashok regarding required
variation in the specification of the generator for operation in the present occurrence of
high frequency in the eastern grid for a larger part of the day and necessity of the two
transformers of 37.5 MVA capacity referred to in the Project Report prepared in May, 1998.
15.1 Mr. D. Ashok, in reply assured that the Project Report on 30 MW
CPP prepared in May, 1998, will be suitably revised to incorporate the suggestion of the
Orissa Electricity Regulatory Commission in a Detailed Project Report (DPR) to be prepared
freshly and submitted to the Commission at the earliest.
15.2 Accordingly, the petitioner filed a DPR with a forwarding letter
on January, 19, 1999 taking note of the objection (vide page 13 of the DPR) raised by the
Director (Engg). In the revised DPR, the petitioner has indicated that the CPP will be
operated in isolated mode in the event of grid frequency exceeding the limits of frequency
variation for which the generator is designed.
It also explained that out of the two 37.5 MVA transformers considered
in the DPR, one will be used for stepping down power received from Gridco at 132/11.5 KV
for feeding the furnace load which will be retained even after installation of the CPP and
also availing emergency/start-up power, while the second will be required for stepping up
the power generated by the CPP at 11 KV to 132 KV for parallel operation with the grid.
16. In the facts and circumstances of the case, the Commission is of
the opinion that the consent as prayed for may be granted particularly in view of the fact
that Gridco's supply of power is unable to match the reliability and the cost of power of
the CPP proposed by the petitioner. However, while granting consent to M/s. NBFA Ltd.,
Commission has to take note of the fact that the power procurement planning and financial
viability of the licensee of the area is not adversely affected. Accordingly certain
stipulations as below have to be incorporated in the consent:
The generation of power from the CPP should be restricted to the
requirements of applicant as outlined in the application.
Commissioning of the CPP in all respect shall be completed within 5
years from the date of this order, failing which fresh consent of the Commission has to be
sought.
The petitioner shall make adequate arrangements to prevent the flow
of power to Gridco's system and in case, it flows inadvertently when in parallel, no
charges/fees/ duties will be payable by the concerned transmission licensee.
Any sale of power to Gridco or third party shall need prior approval
of this Commission through separate filing.
Gridco shall not be liable for incur any financial liability
whatsoever due to loss of load or generation or damage to the plant on account of system
disturbance and system conditions while running in parallel with integrated Gridco's
system;
The cost of any upgradation of equipments on Gridco's system due to
increase in fault level arising out of such parallel operation of the CPP shall be borne
by the petitioner. Petitioner shall conduct a system study taking into account their
proposed parallel operation of CPP and appraise the same to Gridco regarding its
compatibility with Gridco system;
The petitioner shall follow the Grid Code disciplines while running
in parallel with Gridco system;
Petitioner shall furnish the full technical details of its equipments
of the CPP to Gridco before procurement and obtain Gridco's "no objection" to
ensure safety of the Grid;
Other statutory clearances from concerned authorities required for
establishment of such coal based thermal power station shall be obtained by the applicant
before proceeding with the procurement of plant;
Clearance from the Electrical Inspector, Orissa is mandatory before
commissioning of the plant.
17. Subject to above said directions and observations, the Commission
has no objection to grant of consent to the petitioner for setting up a CPP of 30 MW to be
operated in parallel with GRIDCO System. But before the final consent is granted in
writing, we order that the case is referred to CEA for consultation in accordance with
provisions of sub-section (2-A) of Section 44 of the Electricity (Supply) Act, 1948.
18. Pronounced this day the 29th January, 1999. Copy to be given to the
petitioner and to M/s. Grid Corporation of Orissa Limited, Bhubaneswar.
(S.C. MAHALIK)
CHAIRMAN
(A.R. MOHANTY)
MEMBER
(D.K. ROY)
MEMBER