SALIENT FEATURES OF RETAIL SUPPLY TARIFF FOR THE
YEAR 2005-06
The electricity tariff in Orissa had remained unchanged
from 01.02.2001 to 31.03.2005.
-
For the year 2005-06, the Commission had retained the
existing level of tariff for most of the categories and in some
categories, the tariff has been reduced as follows:
-
Reduction of rate from Rs.3.20 to Rs.3.10 on consumption
above 200 units in LT Domestic Category
-
Withdrawal of DPS in domestic category
-
Reduction of rate of DPS from 2% per month to 1.25% per
month in respect of other applicable categories.
-
Introduction of ToD tariff for all three phase consumers
except those covered under special agreement, under special tariff and
mini steel plants @ 10 p/u during off-peak hour i.e. from 10 PM to 6 AM
having static meter recording hourly consumption with a memory of
atleast 30 days and facility for downloading data by way printouts.
-
Reduction of Monthly Minimum Fixed Charge in respect of
specified public purpose covering religious institutions, educational
institutions including their hostels, hospitals, dispensaries and
primary health centres owned by Government, local bodies and charitable
institutions, recognised as such by Income Tax Department electric
crematorium and non- commercial sports organisations and public
waterworks from Rs.80.00/kw to Rs.50.00/kw.
-
Consumers at EHT & HT, covered under Special Agreement
will get a discount of 25% on the energy charges in the 1st slab of
Existing Tariff mentioned below provided they fulfill various conditions
with an overall charge not exceeding 230p/u.
EXISTING TARIFF FOR POWER INTENSIVE /OTHER
INDUSTRIES
|
AT E.H.T. |
AT H.T. |
Demand Charge ( Rs / KVA) |
200 |
200 |
Energy Charge (P/U) |
290 |
300 |
Consumption in excess of 50% LF (P/U) |
180 |
200 |
Consumption in excess or 60% LF (P/U) |
150 |
170 |
-
Continuation of incentive tariff for HT & EHT consumer
for higher level of consumption.
-
For encouraging establishment of new industries with
contract demand of 5 MVA and above a discount @ 25% in the 1st slab from
01.04.2005 has been provided subject to condition that they operate at a
guaranteed LF @ 80%.
-
Mini Steel Plants operating at a guaranteed L.F. of 80%
will also avail 20% discount in the 1st slab.
-
ABT to be applied to all State generators and load at
132 KV and above voltage. This means they will have overdrawal penalty
or incentive as will be determined in 15 minutes integration period
recorded through a static meter with memory facility of 30 days and
downloading of data through print outs
-
Fabrication units, Agro Industries, Cold Storage and IT
industries are covered under industrial category
-
Hotel units and BSNL will avail the facility of off-peak
tariff
-
Voluntary declaration of unauthorised use for immediate
regularisation as consumers without penalty.
:: Download ::
DETAIL ORDER OF RETAIL SUPPLY TARIFF
FOR THE YEAR 2005-06 |