NOTIFICATION 
      
    THE 7th SEPTEMBER, 1998 
    ORISSA ELECTRICITY REGULATORY
    COMMISSION REGULATION 03 OF 1998 
      No.OERC/Engg-65/98/1435 In the exercise of powers
    conferred on it by Section 54 of the Orissa
    Electricity Reform Act, 1995 (Act 2 of 1996) and all powers enabling it in that
    behalf, and pursuant to Section 33 (1) of the
    said Act, the Orissa Electricity Regulatory Commission hereby makes
    the following Regulations , namely: 
    1. Short title,
    commencement and interpretation  
    (1) These Regulations may be called the "Orissa Electricity Regulatory
    Commission (Consumers' Right to Information and Standards of Performance) Regulations,
    1998". 
    (2) These Regulations shall be applicable to all Distribution and Retail Supply Licensees
    (hereinafter in the Regulation to be referred as licensee). 
    (3) They shall come into force on the date of their publication in the official Gazette or
    the 1st of January, 1999 whichever is later. 
    (4) They extend to whole of the State of Orissa. 
    (5) The Orissa General Clauses Act, 1937 shall apply to the interpretation of these
    Regulations.   
      
    2. Definitions 
    Unless the context otherwise requires, words or expressions occurring in these regulations
    shall bear the same meaning as in the Orissa Electricity Reform Act,
    1995, the Orissa Electricity Regulatory Commission (Conduct
    of Business) Regulations, 1996 and the Orissa Electricity
    Regulatory Commission Distribution (Conditions of Supply) Code, 1998 or in absence
    thereof, the meaning as commonly understood in the electricity supply industry.  
      
    PART I 
    CONSUMERS' RIGHT TO INFORMATION 
    3. The licensee is obliged to
    inform its consumers of their rights and the licensee's standards of performance with
    regard to and in the manner prescribed under these Regulations as well as the Code of Practice on Payment of Bills, the Complaint
    Handling Procedure and the Tariff Schedule. These will be
    provided free of charge to each new consumer and on payment of reasonable fee to any other
    person.  
      
    4.1 Information Prior to
    Disconnection 
    The consumer shall be provided with the following minimum period of notice. 
    (i) 24 hours notice before disconnection 
    
      for refusal to allow entry to the premises or refusal to
      allow the licensee or his authorised representative to perform any authorised act as per
      Section 20(3) of the Indian Electricity Act, 1910; 
     
    (ii) 48 hours notice before disconnection 
    
      (a) when the insulation resistance at the consumer's
      installation is so low as to prevent safe use of energy as per Rule 49 of the Indian
      Electricity Rules, 1956; 
      (b) when the consumer fails to rectify the defects
      pointed out by the Electrical Inspector as per Rule 46(2)(c) of the Indian Electricity
      Rules, 1956; 
     
    (iii) Seven clear days notice before disconnection 
    
      (a) when the consumer neglects to pay any charge
      for energy or any sum other than a charge for energy due from him to the licensee in
      respect of supply of energy as per Section 24 of the Indian Electricity Act, 1910; 
      (b) when there is default in keeping the meter correct
      where meter is the property of the consumer as per Section 26(3) of Indian Electricity
      Act, 1910; 
      (c) when there is failure to pay the Inspection fees on
      or before the date specified in the fee notice of the Electrical Inspector as per Rule
      46(2)(b) of the Indian Electricity Rules, 1956; 
      (d) when the meter or metering equipment is tampered by
      the consumer or when the replacement of obsolete or defective meter by the licensee is
      resisted by the consumer; 
      (e) when the consumer adopts any electrical appliances
      or uses energy supplied to him unduly or improperly which interferes with the system or
      efficient working of a licensee's system or to the supply of energy to any other person
      (Annexure VI of Rule 27 of the Indian Electricity Rules, 1956); 
      (f) when there is failure to rectify defects relating to
      non-observance of Rules 50, 51(I) or 64 of the Indian Electricity Rules, 1956, pointed out
      by the licensee within the time and the procedure prescribed under Rule 51(4) of the said
      Rules; 
      (g) when the power factor of the load of the consumer is
      less than 60 per cent; 
      (h) when the consumer fails to execute agreement under
      appropriate category as per the notice of the licensee on the basis of the altered
      classification or modified contract demand of the consumer; 
      (i) when the consumer unauthorisedly assigns the
      benefits under the agreement in favour of another, or resells or diverts or transfers the
      same or commits unauthorised abstraction of power. 
     
    (iv) Such other period of notice before
    disconnection 
    when such disconnection is provided under any law, the
    notice period shall be as prescribed in the said law. 
    4.2 Exemption  
    (i) The licensee may be exempted from the notice requirements of this Regulation where
    the consumer's installation poses a danger to the health or safety of the consumers or
    licensee's employees or the public. 
    (ii) Wherever the consumer's supply of electricity has been disconnected without prior
    notice, the licensee shall inform the consumer in writing within twenty four hours of such
    disconnection.  
      
    5. Information for Entry into
    premises 
    Consumers have a right to be informed about the entry into their premises by the licensee
    in accordance to Section 20 of the Indian Electricity Act, 1910.  
      
    6. Intimation for Re-classification
    of Consumers 
    (1) In case the licensee intends to reclassify any consumer in terms of the Orissa Electricity Regulatory Commission Distribution (Conditions of
    Supply) Code, 1998 or otherwise it has to notify the consumer accordingly and has to
    specifically inform, if a fresh agreement needs to be executed in consequence of such
    reclassification. 
    (2) The notice shall state that the licensee may disconnect the supply of power if the
    consumer does not take the required steps as prescribed under the Orissa
    Electricity Regulatory Commission Distribution (Conditions of Supply) Code, 1998.   
      
    7. Notice of Outages  
    The licensee shall provide not less than twenty four hours notice prior to an outage
    exceeding thirty minutes scheduled for the purpose of testing or any other purpose
    connected with the efficient working of the system.   
      
    8. Notice Procedure 
    All notice for disconnection shall be in writing. Notice for scheduled outages may be
    through publication in newspapers/public address system/electronic media/telephone.
    Service of notice to individual consumers shall be governed by Regulation
    112 of the Orissa Electricity Regulatory Commission, Distribution
    (Conditions of Supply) Code, 1998.  
      
    PART II 
    STANDARDS OF PERFORMANCE 
    9. The licensee is required to
    maintain minimum standards of performance for all consumers in the manner prescribed
    hereafter in these Regulations.  
      
    10. Restoration of Power Supply 
    (1) The licensee shall register every complaint of a consumer regarding failure of
    power supply. 
    (2) Within 4 (four) working hours of receipt of complaint, the licensee shall inform, on
    enquiry by the consumer, the likely time by which the power supply may be restored. 
    (3) The licensee shall restore the power supply to the consumer within 24 (twenty four)
    hours of receipt of the complaint except in case of transformer failures and failures of
    11 KV feeder including it's terminal equipment, in which case it shall be within a maximum
    of 7 (seven) days.  
      
    11. Quality of Power Supply 
    (1) Within 4 (four) working hours the licensee shall respond to consumer's complaint
    regarding variations of voltage and frequency of power supply beyond the tolerance limit
    as prescribed, in I.E. Rules, at the point of commencement of supply. 
    (2) Within 15 (fifteen) days of original complaint, the licensee shall either improve the
    quality of power supply or furnish a written reply to the consumer intimating him the
    causes of poor quality of power supply, if the same is beyond licensee's control; 
    Provided that complaint regarding low voltages arising due to inadequacy in the
    distribution system requiring upgradation of distribution lines, transformers or
    installation of capacitors shall be resolved within six months.  
      
    12. Period of Scheduled Outages 
    Period of interruption due to scheduled outage shall be specified in the notice and shall
    not exceed 12 (twelve) hours on any day. In each event the licensee shall ensure that
    supply is normally restored by 6.00 PM during summer and by 5.00 PM during winter.  
      
    13. Complaints on Meter 
    (1) If the licensee has reason to believe that the meter at the consumer's premises
    is incorrect, he may at any time after giving seven days notice to the consumer, remove
    the existing meter for the purpose of testing in accordance with section 26(4) of the
    Indian Electricity Act, 1910. If after testing, the meter is found defective not due to
    tampering or deliberate damage, the defective meter shall be replaced by another tested
    meter within 30 (thirty)working days from the date of removal of meter from the consumer's
    premises. 
    (2) If the meter is the property of the consumer, the licensee within seven working days
    of noticing the defect shall advise the consumer for necessary test, repair or replace the
    meter. The licensee shall give 7 (seven) clear days notice of disconnection if the
    consumer doesnot repair/replace his defective meter within 30 (thirty) working days of
    such advice.  
      
    14. Applications for New Connection 
    (1) For 230V/400V supplies: 
    The licensee shall deal with consumer's application for new connection as follows: 
    
      (a) Within three days of receipt of application, the
      licensee shall send three clear days notice to the applicant as prescribed in Regulation 12(1) of the Orissa
      Electricity Regulatory Commission Distribution (Condition of Supply) Code, 1998 for
      the purpose of inspection of premises and fixation of point of entry of supply mains and
      the position of mains, cutouts or circuit breakers and meters. 
      (b) Estimate charges for providing connection and
      security deposit required shall be intimated within one week after the point of entry of
      supply mains and the position of mains, cutouts or circuit breakers and meter has been
      settled. 
     
    
      (c) Within 3 (three) days of receipt of completion
      report and the test report of the licensed contractor, the licensee will give 3 (three)
      clear days notice to the applicant of the time and the date when his representative
      proposes to inspect and test the installation. On due compliance by the applicant as
      prescribed in Regulation 38 of the Orissa
      Electricity Regulatory Commission Distribution (Conditions of Supply) Code, 1998, the
      licensee shall complete the inspection of the installation within a period of ten days
      from the date of receipt of test report of the licenced contractor. The licensee shall
      notify the applicant in writing of any defect noticed within seven days of inspection. If
      no intimation is received by the applicant within seven days of inspection, the
      installation will be deemed to have been approved. 
      (d) After completion of all other formalities prescribed
      in the Orissa Electricity Regulatory Commission Distribution
      (Conditions of Supply) Code, 1998 and within 7 (seven) days of approval of applicant's
      installation, the licensee shall commence supply of power to the applicant. 
     
    (2) For H.T. supply up to 33KV and EHT supply: 
    The licensee shall deal with of consumer's application for new connection as follows: 
    
      (a) If supply is requested to be given at H.T., the
      licensee shall respond whether connection is feasible or not within 60 (sixty) working
      days of application. If feasible, licensee shall intimate voltage at which supply will be
      given and point of commencement of supply. The licensee shall intimate the consumer
      seeking the new connection, estimated charges and time required for providing the new
      connection within 60 (sixty) working days of notifying feasibility of supply. 
     
    
      (b) If supply is requested to be given at EHT, the
      licensee shall obtain the final reply regarding feasibility from the Transmission and Bulk
      Supply licensee and communicate the same to the applicant within 60 (sixty) working days
      of receipt of original application. The licensee shall intimate the consumer seeking the
      new connection, estimated charges and time required for providing the new connection
      within 60 (sixty) working days of notifying feasibility of supply. 
      (c) Connection shall be provided within the estimated
      time, as intimated, after deposit of Estimated charges, submission of Test Report by
      consumers, inspection by Supplier's Engineer/Electrical Inspector and Agreement, if
      required. The licensee shall, however, not be held responsible for delay, if any, for
      providing connection, if the same is on account of statutory clearances, Rights of way,
      acquisition of land over which licensee has no reasonable control.  
        
     
    15. Complaint on Consumer's Bills 
    (a) The licensee shall reply to the consumer's complaint within 7 (seven) working days of
    the receipt of the complaint. 
    (b) The licensee shall resolve consumer's complaint regarding Electricity Bills due to him
    or served to him, within two months of receipt of complaint.  
      
    16. Exemption 
    These standards of performance shall remain suspended during Force Majeure condition such
    as war, mutiny, civil commotion, riot, flood, tempest, lightning, earthquake or other
    force or cause beyond the control of the licensee and strike, lockout, fire affecting the
    licensee's installations and activities.  
      
    PART III 
    MISCELLANEOUS 
    17. Issue of orders and practice
    directions 
    Subject to the provisions of the Orissa Electricity Reform Act, 1995
    and these Regulations, the Commission may, from time to time, issue orders and practice
    directions in regard to the implementation of the Regulations and procedure to be followed
    and various matters which the Commission has been empowered by these Regulations to
    specify or direct.  
      
    18. Power to remove difficulties 
    If any difficulty arises in giving effect to any of the provisions of these Regulations,
    the Commission may, by general or special order, direct the licensees to do anything not
    being inconsistent with the provisions of the Orissa Electricity Reform
    Act, 1995, which appears to it to be necessary or expedient for the purpose of
    removing the difficulties.  
      
    19. Savings 
    Nothing in these regulations shall affect the rights and privileges of the consumers
    under any other law including the Consumer Protection Act, 1986. 
    By the order of the
    Commission
    (M. R. MOHANTY) 
      SECRETARY 
    ORISSA ELECTRICITY REGULTORY COMMISSION
        
       |